注: 该材料由 TEKNOR APEX 厂家直供,厂家技术人员进行生产指导,提供正规出场报告,相关检测报告等。
种类 : | PA66 |
品牌 : | Chemlon® |
用途 : |
Chemlon® E-66 GF30 原厂PDF物性资料.pdf
订购热线:021-58958519 13061808058(赵先生)
基本信息 | |
---|---|
填料/增强材料 |
|
外观 |
|
加工方法 |
|
物理性能 | 额定值 | 单位制 | 测试方法 |
---|---|---|---|
密度 | 1.37 | g/cm³ | ISO 1183 |
收缩率 1 | 0.30 到 0.70 | % | 内部方法 |
吸水率 (平衡, 23°C, 50% RH) | 1.8 | % | ISO 62 |
机械性能 | 额定值 | 单位制 | 测试方法 |
---|---|---|---|
拉伸模量 | 8000 | MPa | ISO 527-2 |
拉伸应力 (断裂) | 165 | MPa | ISO 527-2 |
拉伸应变 (断裂) | 3.0 | % | ISO 527-2 |
弯曲模量 | 7000 | MPa | ISO 178 |
弯曲应力 2 | 195 | MPa | ISO 178 |
冲击性能 | 额定值 | 单位制 | 测试方法 |
---|---|---|---|
悬壁梁缺口冲击强度 | 7.0 | kJ/m² | ISO 180 |
热性能 | 额定值 | 单位制 | 测试方法 |
---|---|---|---|
热变形温度 | |||
0.45 MPa, 未退火 | > 240 | °C | ISO 75-2/B |
1.8 MPa, 未退火 | 230 | °C | ISO 75-2/A |
注射 | 额定值 | 单位制 | |
---|---|---|---|
干燥温度 | 80.0 | °C | |
干燥时间 | 2.0 | hr | |
料筒后部温度 | 275 到 300 | °C | |
料筒中部温度 | 275 到 300 | °C | |
料筒前部温度 | 275 到 300 | °C | |
加工(熔体)温度 | < 300 | °C | |
模具温度 | 80.0 到 90.0 | °C | |
注射速度 | 快速 | ||
螺杆转速 | 50 到 200 | rpm |
注射说明 |
---|
Back pressure: LowInjection pressure: HighThe material is supplied dry and ready to mould in sealed, moisture proof sacks. No drying is necessary unless the material has been exposed to air for longer than three hours. The appearance of splash marks on the surface of mouldings indicates excessive moisture is present. Should drying become necessary, two hours at 80°C in a dehumidifying drier is recommended. The use of air circulating driers is not generally recommended, as longer drying times are often required, with greater potential for product oxidation and yellowing. Drying temperatures should not exceed 80°C. |
备注 | |
---|---|
1 . | Mould shrinkage is significantly influenced by many factors including wall thickness, gating, component shape and moulding conditions.The range values stated were determined from specimen bar mouldings of 1.5mm to 4mm wall thickness. They are provided as a guide for comparison purposes only and no guarantee should be inferred from their inclusion. (Specimens measured in the dry state, 24 hours after moulding). |
2 . | At Break |